GYPSUM BOARDINSTALLATION STEPS

Wall Control

The location and stability of the cladding wall are determined. The line on which the U-profile should be fixed is marked with a pencil. The traces on the floor are brought to the ceiling with the help of pipes and pulled to the ceiling with the help of dyed twine.

Preparation Of Metal Profiles

The length of the wall covering is determined with a tape measure and the U-profiles are cut to the desired length. C-profiles have been shortened by 1 cm from the ceiling height to facilitate installation. When the C-profiles are cut to the maximum, even the smallest error during assembly can have a significant impact during assembly. Before fixing, place the sound insulation tape on the profile. The number of C profiles is calculated by accepting profiles with a distance of 60 cm. For wet wall use, the wheelbase should be 40 cm.

Fixing U-Profiles

U profiles are mounted on the floor and ceiling with a drill with the help of dowel + screw + washer.

Read our related articles to learn more about our metal profiles!

Fixing The Staples

Choose the appropriate screws according to the distance between the wall covering and the building wall and fix it to the wall with pins and screws.

Installation Works and Insulation

Before the assembly of the panels, electrical installation and installation should be done. For example, you can use an access panel to hide plumbing or electrical maintenance.

Plasterboard Screwing

Screw the drywall to the U and C profiles on the edge of the drywall using a drill or hammer. When tightening the screws, make sure that the clearance is not more than 30 cm and that the screws are removed correctly. When nailing, the distance between the nail and the plasterboard edge should not be less than 1 cm.

Plasterboard Screwing

You need to patch corners or fill cracks. For example, you can use all purposes together for a simpler and cleaner finish. After the first drying, the second coat should be applied. Also note that the drying time can vary from 12 to 24 hours depending on the temperature. Done, then you can start painting your drywall.